National Grid: Electricity and Gas Infrastructure (3rd Party Data)
These datasets detail the extent and location of various electricity and gas infrastructure that are managed and owned by the National Grid. Natural Resources Wales (NRW) has access to these datasets through a licence agreement.
- Identification
- Extent
- Distribution
- Quality
- Keywords
- Spatial Reference System
- Content
- Constraints
- Maintenance
- Metadata
Identification
- Identifier
- EXT_DS121887
- Alternative Title
-
- High pressure gas mains
- Gas sites
- Underground cable lines
- Substations
- overhead line routes
- Line towers
- high voltage lines
- cable fibre lines
- Metadata Language
- English
- Lineage
-
The dataset NRW has access to includes: - Cable Fibre Lines - High Voltage Lines - Line Towers - Overhead Line Routes - Substations - Underground Cable Lines - Gas Sites - High Pressure Gas Mains
- Dataset Reference Date (Publication)
- 2023-12-12
Extent
Extent
Bounding Box
Distribution
- Format Type and Description
-
-
Geographic Information System
()
- Specification
-
ESRI Feature Class
-
Geographic Information System
()
Quality
Data quality
- Quality Scope
- Dataset
- Lineage
-
The dataset NRW has access to includes: - Cable Fibre Lines - High Voltage Lines - Line Towers - Overhead Line Routes - Substations - Underground Cable Lines - Gas Sites - High Pressure Gas Mains
Keywords
Keywords
- NRW Thesaurus
-
- 3rd Party Data
- Third Party Data
- electricity
- gas
- Type
- Theme
Citation
- Date (Publication)
- 2023-12-31
Spatial Reference System
- Code
- NONE
Content
Content Information
NRW Profile
Custom Elements
Constraints
Constraints
Limitations on Public Access and Use
- Restriction type
- Other restrictions
Access Constraints Directive
- Limitations
- no limitations
Access Constraints Text
- Other constraints
-
This dataset is wholly owned by the National Grid. These datasets are for indicative purposes only. They can only be used for emergency and land use planning and cannot be used for commercial purposes. Enquirers are advised to obtain a copy from the owner/originator directly, rather than NRW. “f you are planning to undertake any ground works, please visit the Cadent Gas website ( https://cadentgas.com/home ) or contact the Plant Protection team at least 14 days in advance. Information Warning: This data is supplied by National Grid on a best-effort basis only, using available information as documented at the time by the transmission network operators. While every effort is made to make sure the information is accurate and up-to-date, National Grid do not accept any liability for any direct, indirect, or consequential loss or damage of any nature--however caused--which may be sustained as a result of reliance upon such information
Use Constraints
- Use constraints type
- Other restrictions
- Other constraints
-
© National Grid UK NRW does NOT grant permission to third parties to re-use or disseminate this dataset. Those seeking such permission should approach the originator directly. Attribution Statement: "© National Grid UK"